Monday, March 24, 2014

Setting up for Babbit Bearing Pour

I built this temporary frame to position the primary shaft including the runner stone which will center the bearing and main shaft with respect to the frame. I'm using the upper bearing caps on both out board and inboard bearings to position the shaft accurately and then I built this V block stub shaft support near the end of the frame